Skip to content
MIVARE LABS OUTDOORS A SYSTEM FOR OUTDOOR SERVICE AND LANDSCAPING COMPANIES
Industry templates. Mivare Outdoors Help Centre
AREA 01 · SERVICES AND QUOTES · TOPIC 07

Industry templates

You attach ready lists of stages, tasks, site visit questions and handover criteria to a service line and apply them with one command in a project or a visit.

IN THE APP
Modules › Projects › Templates
KINDS
Stages, checklist, questionnaire, protocol
LIMIT
Up to 300 templates per company
CONNECTIONS
4 modules

01What it is

A template belongs to a service line and has one of four kinds: stages, checklist, site visit questionnaire or handover protocol. You enter the items one per line, up to 40 in a template. In a stage template add after a vertical bar the number of days from 0 to 365, for example Laying the surface | 4. Without a number a stage lasts one day.

A company can have up to 300 templates, and the name of a template of a given kind is unique within a service line. You cannot apply an inactive template. Deleting a template does not undo what you have already applied: the stages, tasks and criteria stay.

How it is applied depends on the kind. Stages add further stages to a planned, ongoing or paused project, from the day you choose. A checklist adds tasks to the project, optionally at a stage. A handover protocol creates the handover of the chosen stage with the criteria from the template. A questionnaire adds questions to the measurements of a planned site visit of an enquiry that is neither won nor lost.

You cannot apply a template to a project that is handed over. If items with the same names already exist in the project, the app refuses so that entries are not duplicated. You reach templates with the permission for projects, and a questionnaire also needs the right to edit enquiries.

KINDS
Stages, checklist, site visit questionnaire and handover protocol.
ITEMS
Up to 40 per template, one per line, a stage length after a vertical bar.
LIMIT
Up to 300 templates per company.
APPLYING
Only to a project that is not handed over and only with an active template.

02Tasks step by step

  1. STEP 1Open Modules › Projects › Templates and choose New template.
  2. STEP 2Enter the name, choose the service line and the kind Stages.
  3. STEP 3Enter the items one per line, with the number of days after a vertical bar, and save.

03What it connects to

PROJECTS AND CREWS

Stage schedule

Project stages and their dates.

Go to the topicStage schedule