01What it is
The Fences and gates line organises enquiries about fences and gates. It is switched off at the start: you switch it on in Modules › Sales › Service catalogue, on the Service lines tab. You can rename the line with the Edit command, and then you choose the line in an enquiry, in a catalogue item and in a maintenance plan. The licence includes one active line, further lines need an add-on, and during the free trial all of them work.
The company gets a season window for this line: installing, impregnating and painting fences from April to October, in dry weather and at a temperature above about 8 degrees (that is what the note of the window says). The window has the type Other, so the warning about a date outside the window applies to stages with the season type Other. The warning blocks nothing. You can change the window in Modules › Projects › Weather and season.
You calculate lengths for a quote in Modules › Sales › Estimates. A measurement has the type Perimeter or Length, a required source and a result, and the lines calculate the quantity from a usage norm and waste. Catalogue items have the unit m (running metre) and kinds such as Material, Labour and Subcontractor, so a gate drive installation can be a subcontractor item. In a quote with options you show the client several variants, for example with a different material.
You record a fence on the property card as a zone of the type Fence, and approvals (the types Boundaries, Access, Permit and Consent) in the Approvals tab, with a status, a due date and a validity date. The approvals register supports a checklist and does not confirm compliance with the law. The app has no fence configurator with spans and posts and no register of gate drive inspections. You enter the warranty with care instructions on the warranty card of the project after the final handover.
- INSTALLATION WINDOW
- April to October, season type Other.
- MEASUREMENTS IN AN ESTIMATE
- Length or Perimeter with a source, a usage norm and waste.
- UNIT
- Catalogue items in running metres (m) or in other units.
- APPROVALS
- Boundaries, Access, Permit and Consent on the property card.
02Tasks step by step
- STEP 1Open Modules › Sales › Estimates and choose New estimate.
- STEP 2Choose the customer, enter the estimate name and save it.
- STEP 3On the card choose Add a measurement, as the Type of measurement choose Length or Perimeter and enter the Result.
- STEP 4In the Where the figure comes from field choose the right source and fill in Source or assumption (required).
- STEP 5Choose Add an estimate line, point to the measurement in the From a measurement field and enter the usage norm, the waste and the net unit cost.
- STEP 6Check the cost with reserve and the net price with margin in the summary.
- STEP 1Open Modules › Sales › Service catalogue and stay on the Items tab.
- STEP 2Choose New catalogue item.
- STEP 3Enter the Name, choose the Kind and the unit m.
- STEP 4In the Service line field choose Fences and gates or For all lines.
- STEP 5Enter the Net unit price and the VAT rate (%).
- STEP 6Save the item. It appears in the list with the name of the line.
03What it connects to
Costing
The service catalogue with prices and the VAT rate, and the items in a quote.
Go to the topicCostingQuote with options
The variants of a quote, for example with a different material.
Go to the topicQuote with optionsAccess and conditions
Access, entry and boundaries recorded on the property card.
Go to the topicAccess and conditions