01What it is
The Irrigation and outdoor lighting line is the last of the six ready lines. It is switched off at the start, so you switch it on in Modules › Sales › Service catalogue, on the Service lines tab. After that you choose it in an enquiry, in a service catalogue item and in a maintenance plan, and a project has the line of the enquiry that its quote came from. The licence includes one active line, further lines need an add-on, and during the free trial you can switch on all of them.
The ready season windows are the start-up of irrigation after winter from March to April (checking the sprinklers, checking the pressure, setting the controller) and winter protection in October and November (blowing out and draining the system so that pipes and sprinklers do not crack). You view and change the windows in Modules › Projects › Weather and season, on the Season windows tab. A stage with the season type Winter protection and a date outside the window gets a warning.
You run the yearly inspection of the system as a maintenance plan in Modules › Projects › Maintenance: the frequency Yearly (or Quarterly), the date of the first visit, the net price of a visit, the person who carries it out and notes on the scope. Visits appear in the list 60 days ahead, so with a yearly rhythm a visit is visible when its date comes near. After the final handover the warranty card of the project keeps the warranty, the care instructions and the date of the post-season service.
The app has no system diagrams, no division into watering sections, no controller schedule and no register of luminaires and power supplies. The line is a label, and you price the work (materials, labour, subcontractors) in the service catalogue and in an estimate. You keep sprinklers, pipes and luminaires as materials in the Materials and plants register, with stock levels and usage on projects.
- LINE
- Irrigation and outdoor lighting.
- SEASON WINDOWS
- Start-up from March to April, winterising from October to November.
- YEARLY INSPECTION
- A maintenance plan with the rhythm Yearly or Quarterly.
- POST-SEASON SERVICE
- The date and its completion on the warranty card of the project.
02Tasks step by step
- STEP 1Open Modules › Projects › Maintenance and on the Plans tab choose New maintenance plan.
- STEP 2Enter the plan name and choose the customer, the property and the service line Irrigation and outdoor lighting.
- STEP 3As the visit frequency choose Yearly and enter the date of the first visit.
- STEP 4Enter the net price of one visit, choose a person in the Carried out by field and write the scope of the inspection in the notes.
- STEP 5Save the plan. The visit appears on the Visits tab when its date falls within 60 days.
- STEP 1Open Modules › Projects › Projects and choose a project to open its card.
- STEP 2On the Stages tab choose Add a stage or edit an existing one.
- STEP 3In the Season type field choose the type of work, for example Winter protection.
- STEP 4Enter the start of work and the due date of the stage, then save.
- STEP 5When the date falls outside the window of the line, the stage shows the Outside the season window badge with the months of the window. This happens only when the enquiry of the project has a service line chosen.
03What it connects to
Recurring services
A maintenance plan with a rhythm and ticking off visits.
Go to the topicRecurring servicesCatalogue
The materials register where you keep sprinklers, pipes and luminaires.
Go to the topicCatalogue